Additions allowed for the creation of grade   for daylighting. A third gymnasium was
                 level learning neighborhoods with skylit      converted into music spaces. The old, low
                 flexible learning commons at the center of    ceiling, non-daylit library was transformed
                 them. The end of each of these learning       into a Project Lead the Way Lab and fitness
                 neighborhoods provides a new science lab/     lab. Windows were added to existing
                 classroom with an outdoor teaching area       classrooms to provide additional natural light
                 for science. Each neighborhood’s identity     equivalent to the new classrooms.
                 is reinforced by the interior design concept
                 through color, signage and pattern which      At the scale of the site a parent drop-off area
                 reinforces way finding in the school. Interior   and visitor parking area was created separate
                 design elements are asymmetrical and color    from the bus drop-off and faculty parking
                 palettes are more sophisticated than in the   area. This created the opportunity for a new
                 district’s elementary schools recognizing the   front door and image for the school with
                 development of student’s minds.               canopy, sign wall, benches, and flag pole
                                                               facing the main road. This new secure entry
                 The learning neighborhoods are all grouped    is adjacent to the relocated administrative
                 around a new library/information commons      offices and leads directly into the newly
                 with small group rooms for student            expanded cafeteria dining area/student
                 collaboration and flexible seating and stack   commons.
                 areas. A new outdoor classroom was created
                 immediately outside the building.             The planning also created a Master Plan for
                                                               possible future additions to accommodate
                 All existing spaces were renovated with       enrollment growth. The construction of
                 the cafeteria expanded to allow for greater   the project occurred while the school was
                 capacity in the dining area and a scramble    occupied requiring particular attention to
                 serving area. The dining area was also skylit   safety of students and staff.