Page 89 - 2022 Annual Report 2022 FINAL
P. 89

Cornerstone Church Phase 2 Addition-

               Construction is beginning on Phase 2 to create the community space that the church desperately
               needs beyond the walls of the 3,500 seat sanctuary.  65,000 SF will be dedicated to several key
               functions, including a large hall adjacent to an espresso bar and full-service restaurant.  A
               mezzanine is perched above, offering favored views in a quieter setting.  The upper floor includes
               a large banquet hall, catering kitchen, and an adult classroom suite.  And a children’s assembly
               suite resides next to the exterior and peers out onto an outdoor playground.  Construction of the
               facility will continue through 2024.

               Cornerstone School

               Cornerstone Christian School’s K-12 classical education campus is located several blocks from the
               church.  We are simultaneously working on three separate projects to anticipate their growing
               student body.  An interior renovation will convert a small band hall into expanded seating for their
               overutilized cafeteria.  Reliable outdoor dining is also facilitated with the addition of an outdoor
               dining pavilion.
               Second, the project will add a three story, 26,000 SF classroom addition with a band hall and black
               box theater at the lowest level.  The façade will acknowledge the historic rhythm of punched
               window openings and layered masonry articulation while at the same time creating a more
                                       st
               transparent and inviting 21  century learning institution.



































               Lastly, a concessions and restroom building will serve existing sports fields with a new facility
               that is low maintenance, naturally ventilated, and compatible with while not imitating the
               traditional architecture of the campus.



                                                          Page | 72                 Faith Based Practice Report
   84   85   86   87   88   89   90   91   92   93   94