Page 131 - AR PAM 2024 HIGHRES_4 Direksi
P. 131

Tata Kelola Perusahaan    Tanggung Jawab Sosial Perusahaan
                      Good Corporate Governance  Corporate Social Responsibility





                                                         Penelitian dan Pengembangan

                                                                                 Research and Development







































                  Berbagai upaya terus dilakukan oleh PAM JAYA dalam rangka untuk   Various efforts continued to be made by PAM JAYA to develop
                  pengembangan infrastruktur jaringan perpipaan air minum terutama   the drinking water pipe network infrastructure, especially in the
                  di area terjauh dari fasilitas Produksi air PAM JAYA. Beberapa lokasi   farthest areas from PAM JAYA’s water production facilities. Some of
                  pengembangan diantaranya di Jakarta Barat (Pegadungan dan   the development locations include Pegadungan and Semanan in
                  Semanan) dan Jakarta Pusat (Kelurahan Kebon Kosong Kecamatan   West Jakarta, and Kebon Kosong Subdistrict in Kemayoran, Central
                  Kemayoran). Pengembangan infrastruktur jaringan perpipaan   Jakarta. The infrastructure development of the pipeline network
                  di Jakarta Barat (Pegadungan dan Semanan) bertujuan untuk   in West Jakarta (Pegadungan and Semanan) aims to expand PAM
                  menghadirkan pelayanan PAM JAYA melalui penambahan supply   JAYA’s service by increasing water supply and providing direct
                  air dan pelayanan pelanggan langsung oleh PAM JAYA.  customer service by PAM JAYA.


                  Area pegadungan dan Semanan merupakan area potensial   In the areas of Pegadungan and Semanan, which are potential
                  dimana terdapat beberapa kawasan perumahan. Supply air ke   residential areas, water supply is planned to come from the Karian
                  area tersebut direncanakan berasal dari SPAM Karian Serpong   Serpong Water Treatment Plant, scheduled to begin supplying water
                  yang akan mulai memasok kebutuhan air pada tahun 2027. Guna   in 2027. To expedite PAM JAYA’s services before the operation of
                  percepatan pelayanan PAM JAYA, sebelum SPAM Karian Serpong   the Karian Serpong plant, innovative new water supply methods
                  beroperasi, dilakukan inovasi supply air baru yang diantaranya   are being implemented. These include utilizing bulk water supply
                  memanfaatkan supply air curah dari Perumda Air Minum Tirta   from Perumda Air Minum Tirta Benteng, which will later be replaced
                  Benteng yang nantinya akan digantikan oleh supply SPAM Karian   by the supply from the Karian Serpong plant in 2027. Additionally,
                  Serpong yang direncanakan tahun 2027 dan rencana peralihan   there are plans to transition the management of the Citra Garden
                  pengelolaan Instalasi Pengolahan Air (IPA) Citra Garden City 2     City 2 ext Water Treatment Plant to PAM JAYA.
                  extension oleh PAM JAYA.
















                  LAPORAN TAHUNAN 2024                          131                                Annual Report 2024
   126   127   128   129   130   131   132   133   134   135   136