Page 21 - UniZulu Annual Report 2020
P. 21

  ready-to- implement projects that are funded, allowing for the development of implementation packages. The infrastructure implementation packages are outlined in tables 10 and 11:
Table 10: Refurbishment Packages
Table 11: New Build
 PACKAGE NO.
 CLASSES INTHE PACKAGE
 PACKAGE BUDGET
   Package 7
 Class 1 (Buildings)
   R36 950 000.00
 Package 8
 Class 2A, 2B , 5 + Disable Access (Buildings)
 R64 204 706.20
 Package 9
 Class 3 Roads & Civil & Structural Infrastructure
 R53 893 921.00
 Package 10
 Class 4 M&E plus H&S
 R29 385 314.00
 TOTAL
    R184 433 941.20
    PACKAGE NO.
 PACKAGE DESCRIPTION
 SIZE (SQM)
  PACKAGE BUDGET
 Package 1
 Student Residences – 208 Beds
 4 557
  R72 912 000
 Package 2
  Student Residences – 285 Beds
 6 279
  R100 464 000
  Package 3
   Student Residences – 119 Beds
 2 610
  R41 760 000
 Student Residences – 22 Beds
 480
  R7 680 000
 Package 4
   New Student Centre
 4 105
  R52 825 525
 Fleet Management Depot
 TBC
  R450 000
 Package 5
  Security CCTV & Access Control Installation
  -
   R25 174 000
   Package 6
New Engineering Building in Richards Bay
  7 200
 R10 000 000
 TOTAL
    25 231
   R311 265 525
      1 9 UNIVERSITY OF ZULULAND ANNUAL REPORT 2020
   








































   19   20   21   22   23