Page 5 - [Seoyoung] BIM Brochure_English
P. 5
03
12
2023 •Samsung Electronics Pyeongtaek Water Purification Plant 3rd Stage Construction
Basic and Detailed Design Services YEARS
2022 •Gyeyang-Ganghwa Expressway Construction Project Basic and Detailed Design(Lot 6)
•Saemangeum~Jeonju Expressway Construction(Lot 8) and Bypass Road BIM Services HISTORY
•Completion of the Golden Sunset Bridge and Outer Circumferential Road for the
Administrative Complex City, and BIM Services for 5 Living Zones
2021 •[R&D] Development of Intelligent Technology-based Risky Road Linear Improvement
Model and Geometric Validation Core Technology
•[R&D] Digital Collaboration Planning Study for BIM-based Infrastructure Design
•Busan New Port~Gimhae Expressway Construction Project (Lot 1) Basic and Detailed
Design Services(Full-scale BIM Design)
•Saemangeum~Jeonju Expressway Construction Project (Lot 8) In-progress BIM
Implementation (Tower Crane Application Review)
•Highway Route 25 Honam Extension Project Feasibility Assessment and Basic Design
(Full-scale BIM Design)
•Port BIM Pilot Model Production for Verification of Port BIM Platform Utilization
•Gangneung~Jejin Single-track Railway Lot 8 Construction Project Feasibility Study
and Detailed Design Services (Full-scale BIM Design)
•Gangneung~Jejin Single-track Railway Lot 3 Construction Project Feasibility Study
and Detailed Design Services (Full-scale BIM Design)
2020 •[R&D] Development and Application of Standard Type of BIM Digital Model for Railway
Infrastructures
•[R&D] Development of Integrated Data Model with LH Construction Information
•[R&D] Development of Library-Based Equipment Automatic Clash Check and 05
Verification Technology
•Yangju Ore Zone Land Development Project Survey and Design (Including BIM)
•Namyangju-Wangsuk Public Residential Area
•Samsung Electronics Pyeongtaek P3-PJT BIM Design
2019 •Saemankeum-JeonJu Expressway Construction ( Lot 6 )
•Daesan-Dangjin Expressway Construction ( Lot 5 )
2018 •[R&D] Development of BIM-based technologies for integrated operation and
management of port facilities by life cycle
•Namyangju-Jinjeop Public Residential Area 0 3 High Speed Railroad Station
Construction ( KTX Dongtan )
2017 •X2-PJT XIAN in China 4D simulations and Quantity
•Sacheon-Seonin Public Residential Area Estimate of station structures by
•Construction and Upgrading of E-Ring Road(Qatar) applying BIM
2016 •Pyeongtaek Industrial Complex 0 4 BIM for Wooden Bridge
•[R&D] Planning and research to lay foundations for introduction and activation of BIM ( Hanareum )
for port and harbor IM to the wooden truss bridge in
Micheongol National Recreation
2015 •Discharge Culverts in Pyeongtaek Industrial Complex Forest
•[R&D] Development of Standard Technology of BIM-Based Management for Railway 0 5 BIM for Railroad
Infrastructure ( Jung-Ang Line’s Dodam-
•World Cup Grand Bridge ( Cable-Stayed Bridge ) Yeongcheon )
•Qatar IDRIS-Package 3&4 Sewage Treatment Equipment BIM which includes 3D rendering of
each geographical feature and
2014 •4D System for Pyeongtaek Industrial Complex Construction Management configuration of topography,
2013 •Qatar CP01-C1, C2 & C3 Package retaining walls, and excavating
sections