Page 4 - Microsoft Word - Formatted DPR Raipur Chapters 1 to 9
P. 4

LIST OF ANNEXURES -

                       Annexure  1      Population Projection of Dehradun
                       Annexure 2       Ward Wise Population Projection for Project area

                       Annexure 3       Zone wise Sewerage Generation in Project area

                       Annexure  4      Comparison of various  technologies for treatment of sewage
                       Annexure  5.1    Hydraulic Design Statement of sewer network for Zone-1 of Project area

                       Annexure  5.2    Hydraulic Design Statement of sewer network for Zone-2 of Project area
                       Annexure  5.3    Hydraulic Design Statement of sewer network for Zone-3 of Project area

                       Annexure  5.4    Hydraulic Design Statement of sewer network for Zone-4 of Project area
                       Annexure  6      Comparative Study between Velocity Generated in Sewer network for
                                        Base Year 2021 and Design Year 2051

                       Annexure  7.1    Details of  Septic Tanks for Zone-1 of Project area
                       Annexure  7.2    Details of  Septic Tanks for Zone-2 of Project area

                       Annexure  7.3    Details of  Septic Tanks for Zone-3 of Project area
                       Annexure  7.4    Details of  Septic Tanks for Zone- 4 of Project area

                       Annexure  7.5    Details of  Septic Tanks for Zone- 5 of Project area
                       Annexure  8      Location of level sensors in the sewerage zone

                       Annexure  9.1    Details of Trenchless crossing in sewerage zone-1
                       Annexure  9.2    Details of Trenchless crossing in sewerage zone-2

                       Annexure  9.3    Details of Trenchless crossing in sewerage zone-3

                       Annexure  9.4    Details of Trenchless crossing in sewerage zone-4
                       Annexure  10     Design calculation of TSPS

                       Annexure 11      Design of Terminal pumping plant ant Nakraunda
                       Annexure 12      Comparison of various pipe materials

                       Annexure  13     Process Design Calculation of STP at Nakraunda
                       Annexure  14     Mechanical equipment list

                       Annexure  15     LCA of STP of 23 MLD Nakraunda
                       Annexure  16     Electrical load list and power consumption

                       Annexure  17     Instrumentation list for STP
                       Annexure  18     SCADA operation philosophy

                       Annexure  19     Implementation Schedule




                  DPR-(WW-DDN-03)                                                                          iii
   1   2   3   4   5   6   7