Page 37 - Report - IEKHS Hurricane IRMARIA IMPACT
P. 37
Areas fixed this summer in July, August and September of 2020, for COVID-19 6 ft. spacing . IEKHS REBUILDING PHASE
Blown out window repaired by the V.I. National Guard IEKHS REBUILDING Phase: Thanks to National Guard and IEKHS Maintenance/
(Summer of 2020), along with them removing wires and
“filaments” hanging from this room. They then spent their
time fixing and relocating the electrical panel box, wires,
ceiling tiles and LIGHTING up this room, which was the old,
old Counselor and Registrar’s room on the western end of
the administrative building. They have enabled us after
three years to identify this room with all the spacing to be
used as a social distanced Study Hall when students are in
the building. This is part of the COVID readiness done this
summer. Next phase, painting and then tiling the floor.