Page 8 - LRCC July 2022 Focus
P. 8

MEMBER NEWS                                                                  FOCUS MAGAZINE  |  JULY 2022



        Trustees Approve Meridian Redevelopment Fund Request

        Investing in Downtown Okemos Infrastructure

        VILLAGE OF OKEMOS, LLC ASSISTING TOWNSHIP IN COMPLETING
        $1.25 MILLION IN IMPROVEMENTS


              he Meridian Township Board of Trustees will       The Meridian Redevelopment Fund was established
              invest $1.25 million into public infrastructure   by Meridian Township with the sale of property
        Timprovements in Downtown Okemos to allow for           within downtown Okemos and supplemented with
        improved roads, utilities, and more. The improvements   general fund and COVID relief federal dollars. The
        will pave the way for the proposed Village of Okemos    fund intends to be used on projects like the proposed
        development to move toward vertical construction on its   Village of Okemos as source funds toward specific
        private land near the public infrastructure projects.   allowable costs. The fund is controlled by the Township
                                                                                                  Board based on
                                                                                                  recommendations
                                                                                                  from the Meridian
                                                                                                  Economic
                                                                                                  Development
                                                                                                  Corporation (EDC).

                                                                                                  The approved
                                                                                                  request does not
                                                                                                  provide dollars for
                                                                                                  private investment,
                                                                                                  including to the
                                                                                                  Village of Okemos.
                                                                                                  The development
                                                                                                  team will assist
                                                                                                  the Township in
                                                                                                  implementing
                                                                                                  and managing
                                                                                                  the infrastructure
                                                                                                  improvements.
                                                                                                  The resolution
                                                                                                  approved
                                                                                                  improvements
                                                                                                  to stormwater
                                                                                                  management,
                                                                                                  gas and electric
        A Resolution to Recommend Approval of the Meridian      utility connection, and addressing water, sewer, and
        Redevelopment Fund request from the Village of Okemos   utility updates within the public rights of way on
        project was unanimously approved at the May 17 Board    Ardmore, Clinton, Hamilton and Methodist streets and
        of Trustees meeting, following an April 26 public hearing.   easements. These streets surround the redevelopment
        The proposed mixed-use Village of Okemos development    project site but are all public land and infrastructure.
        includes a restaurant and retail-focused commercial
        space and apartment living options at the intersection of   The Village of Okemos developer has invested over $6.5
        Okemos Road and Hamilton Road in Okemos.                million to-date for land acquisition, due diligence, asbestos
                                                                abatement and demolition of buildings, pre-development
        “The purpose of using these funds – the $1.25 million – is   planning, architectural plans, and engineering services
        for public infrastructure, specifically to redevelop the   to secure approvals necessary to develop the project.
        streets around this complex that is proposed,” said     Pending all approvals needed, the Village of Okemos
        Meridian Township Trustee Marna Wilson, during the      project is expected to invest an estimated $85 million and
        meeting. “So, this is money we would have to spend at   be completed by the end of 2024. l
        some point, and it makes sense to do this as part of the
        overhaul of this area. So, no matter whether the project
        goes forward or not – this is work that needs to be done.”

    8
   3   4   5   6   7   8   9   10   11   12   13