Page 14 - Master Facility Plan
P. 14

To understand the physical condition of the          Laguna Beach Unified School District
current facilities, the Alpha Capital Forecasting                        DRAFT: May 14, 2014
Report was utilized to help identify and priori-
tize the most critical items throughout the Dis-
trict that will require maintenance, replacement,
or repair. At the very least, the District wants to
preserve the existing facilities as long as possi-
ble.

                                                                                                                                                                                                                                                                                 1

11 Physical Condition Analysis
   9   10   11   12   13   14   15   16   17   18   19