Based on the recommended projected enrollment prepared by Dejong-Richter, the team studied options for
various grade-level configurations in alignment with recommendations from the education visioning outcome.
The projected enrollments were studied and it was decided to use the peak enrollment numbers as the basis for
school capacity for the Master Facility Plan. The current and potential student capacity of each school build-
ing was analyzed to determine the best “fit” of grade levels in each building without major reconfigurations if
possible. Capacity was determined by analyzing the number of classroom spaces available to support student
learning.