Page 36 - DoubleTree Times Square - Client Portfolio (Nov 2020)
P. 36

Mr. Garcia is responsible for overseeing
                                                               projects from pre-construction to final
                                                               completion. He provides direct

                                                               supervision of project personnel and

                                                               support to our clients. During his 18 years
                                                               with Humphrey Rich Construction, Mr.
                                                               Garcia has directly managed over $200

                                                               million in projects. As an industry veteran,

                                                               Mr. Garcia’s dedication and positive attitude
                    Tom Garcia                                 contribute to the success of his projects.
                  Vice President –
               Project Management



                                                BID PR OPOS AL

                         Select ed Major Pr oject Experience:




        Essex House – New York, NY                                The Loews Ventana Canyon Resort – Tucson, AZ
        Upgrade 508 guestrooms to meet the JW Marriott standard brand of   Renovation of 398 guestrooms, corridors, and suites plus all public
        luxury and enhance the guest experience. In addition to renovating   space areas (lobby, meeting  rooms, ballroom, and bar/lounge).
        the guestrooms, 157 bathrooms with tubs were converted to   Contract Value – $5.2 million
        showers and 36 levels of guest corridors renovated.
        Contract Value – $20.5 million                            The Westin Washington DC City Center – Washington, DC
                                                                  Renovation of 406 guestrooms, suites, and associated corridors;
        Hilton Midtown Premium Suites – New York, NY              outer vestibule renovation that included steel, concrete, and glass
        Full demolition of 31 existing guestrooms and conversion to    porte-cochere; elevator upgrades, and lobby renovation.
        4 premium suites and 1 presidential suite.                Contract Value – $9 million
        Contract Value – $5.4 million
                                                                  Walter E Washington Convention Center – Washington, DC
        Hyatt Regency Inner Harbor – Baltimore, MD                The installation of new escalators required renovation of the existing
        Public Spaces: Converted atrium space to public area; constructed   interior public space, including partial demolition/replacement of a
        new broadcast lounges, renovated pre-function area; renovated   portion of two granite stairways, demolition of architectural walls
        ballrooms; updated retail coffee space.                   below 4 existing escalators, and construction of new escalator pits
        Contract Value – $2.1 million                             at the top and bottom of each escalator, including reinforcement of
                                                                  the pod floor structure, which required inserting a 30-ton steel truss
        City Center – White Plains, NY                            beam, providing power for the escalators, modifications to existing
        Complete remodel of the interior and exterior of the shopping   glass escalator guardrails and design and installation of a monitoring
        center with new flooring, lighting, painting, and signage.    panel in the Engineering Command Center.
        Contract Value – $11 million                              Contract Value – $4.6 million
   31   32   33   34   35   36   37   38   39   40   41