Mr. Garcia is responsible for overseeing
projects from pre-construction to final
completion. He provides direct
supervision of project personnel and
support to our clients. During his 18 years
with Humphrey Rich Construction, Mr.
Garcia has directly managed over $200
million in projects. As an industry veteran,
Mr. Garcia’s dedication and positive attitude
Tom Garcia contribute to the success of his projects.
Vice President –
Project Management
BID PR OPOS AL
Select ed Major Pr oject Experience:
Essex House – New York, NY The Loews Ventana Canyon Resort – Tucson, AZ
Upgrade 508 guestrooms to meet the JW Marriott standard brand of Renovation of 398 guestrooms, corridors, and suites plus all public
luxury and enhance the guest experience. In addition to renovating space areas (lobby, meeting rooms, ballroom, and bar/lounge).
the guestrooms, 157 bathrooms with tubs were converted to Contract Value – $5.2 million
showers and 36 levels of guest corridors renovated.
Contract Value – $20.5 million The Westin Washington DC City Center – Washington, DC
Renovation of 406 guestrooms, suites, and associated corridors;
Hilton Midtown Premium Suites – New York, NY outer vestibule renovation that included steel, concrete, and glass
Full demolition of 31 existing guestrooms and conversion to porte-cochere; elevator upgrades, and lobby renovation.
4 premium suites and 1 presidential suite. Contract Value – $9 million
Contract Value – $5.4 million
Walter E Washington Convention Center – Washington, DC
Hyatt Regency Inner Harbor – Baltimore, MD The installation of new escalators required renovation of the existing
Public Spaces: Converted atrium space to public area; constructed interior public space, including partial demolition/replacement of a
new broadcast lounges, renovated pre-function area; renovated portion of two granite stairways, demolition of architectural walls
ballrooms; updated retail coffee space. below 4 existing escalators, and construction of new escalator pits
Contract Value – $2.1 million at the top and bottom of each escalator, including reinforcement of
the pod floor structure, which required inserting a 30-ton steel truss
City Center – White Plains, NY beam, providing power for the escalators, modifications to existing
Complete remodel of the interior and exterior of the shopping glass escalator guardrails and design and installation of a monitoring
center with new flooring, lighting, painting, and signage. panel in the Engineering Command Center.
Contract Value – $11 million Contract Value – $4.6 million