The CUT laboratory itself has seen a lot of improvement in 2021. An additional testing
area has been built (with the assistance of the students as part of training). This is
shown in the annexure. A shade port was built above the area and a fence around it
for security of the equipment. Additional shelves were also added to the storerooms
for extra storage of soil samples and equipment.

Figure 7 - Addition of testing area (built by students)

Figure 8 - Completed testing area