Page 34 - PowerPoint Presentation
P. 34
STEP 1 REMOVE THE BURS AND CLEAN THE SURFACE NEAR BREAKAGE OR HOLE
STEP 2 OVER WRAP THE PIPE, MAKE SURE THE HOLE OR BREAK IN THE CENTER OF THE COUPLING
STEP 3 MAKE SURE THE BRIDGE PLATE GO INSIDE THE COUPING PROPERLY
STEP 4 SET THE BOLTS TO THE THREAD HOLES OF LUG BAR
STEP 5 STRENGTH THE BOLTING BY SPANNER TO THE SET TORQUE
STEP 6 DON'T ROTATE THE COUPLING AGAIN AFTER READY
DATA CHART
SIZE OD RANGE W.P. L1 L2 C1 C2 D R BOLT(M) N.M.
**Special specification available upon request Ver.2015.01
www.australianminingservices.com.au Page 36