Page 34 - PowerPoint Presentation
P. 34

STEP 1   REMOVE THE BURS AND CLEAN THE SURFACE NEAR BREAKAGE OR HOLE
                        STEP 2   OVER WRAP THE PIPE, MAKE SURE THE HOLE OR BREAK IN THE CENTER OF THE COUPLING
                        STEP 3   MAKE SURE THE BRIDGE PLATE GO INSIDE THE COUPING PROPERLY
                        STEP 4   SET THE BOLTS TO THE THREAD HOLES OF LUG BAR
                        STEP 5   STRENGTH THE BOLTING BY SPANNER TO THE SET TORQUE
                        STEP 6   DON'T ROTATE THE COUPLING AGAIN AFTER READY

            DATA CHART
            SIZE      OD RANGE     W.P.    L1     L2       C1       C2     D      R    BOLT(M)   N.M.



































































                    **Special specification available upon request              Ver.2015.01







           www.australianminingservices.com.au                                                   Page 36
   29   30   31   32   33   34   35   36   37   38   39