MOCK DRILL AT FGD RIHAND PROJECT
Emergency for which mock-drill is conduct: Manual Evacuation
Type of mock-drill: Practice Drill
Overall response time: 40 mnts
Good points of mock drill Observed shortfall in mock drill
HSE immediately call to ambulance (First Aider) from
the location. Responsible person with the site in charge The Victim was not taken to a safe place
picked up the phone and reached the location. First Aider on time due to no proper safe access.
check pulse rate by oximeter & Dressing, wound &
secured the pad with roller bandage at location
Corrective actions in related to observed
shortfall in mock drill, Area of improvement Responsibility Target Date
Safe access to be provided for inside chimney raft. Bikash Patel 23/08/2021
11