Page 10 - 20210817 - ECERDC Annual Report 2020 v5
P. 10

WILAYAH EKONOMI PANTAI TIMUR
           28
           28                                                                     WILAYAH EKONOMI PANTAI TIMUR


            PROJEK-PROJEK ECER YANG
            TELAH SIAP PADA TAHUN 2020


                 KELANTAN                 PAHANG


               TERENGGANU                 JOHOR












                                                              SISTEM BEKALAN AIR DAN LOJI RAWATAN AIR DI GANCHONG
                                                                          TARIKH SIAP: 21 JANUARI 2020

















             TAMAN BIOPOLIMER KERTEH, TERENGGANU (FASA 2) –
             PAKEJ 1A: PEMBINAAN KOMPLEKS PERUSAHAAN KECIL
                          DAN SEDERHANA (PKS)
                       TARIKH SIAP: 17 SEPTEMBER 2020


                                                               TAMAN BIOPOLIMER KERTEH, TERENGGANU (FASA 3) –
                                                                                  PAKEJ 3A
                                                                         TARIKH SIAP: 22 SEPTEMBER 2020


























              PEMBINAAN JALAN DARI LAPANGAN TERBANG KUALA        PEMBANGUNAN BANDAR PELABUHAN KUANTAN –
              TERENGGANU KE KUALA TERENGGANU CITY CENTRE                          PAKEJ 3B
            (KTCC) – PAKEJ 1A: KERJA-KERJA PERLINDUNGAN PANTAI    •  KPC Port Link Road   •  Toll Collection System (TCS) dan Toll
                                                                                        Control Surveillance System (TCSS)
                         TARIKH SIAP: 10 OGOS 2020
                                                               TARIKH SIAP: 5 SEPTEMBER 2020  TARIKH SIAP: 31 DISEMBER 2020
   5   6   7   8   9   10   11   12   13   14   15