Page 130 - UK Regulation Part 21 Initial Airworthiness Annex I (consolidated) March 2022
P. 130

PART 21 - INITIAL AIRWORTHINESS (ANNEX I)


                                      Terms of approval document(s) will be issued by the CAA under 21.A.135 to identify the scope of
                                      work, the products, and/or categories for which the holder is entitled to exercise the privileges defined
                                      in 21.A.163.
                                      The codes shown against each scope of work item are intended for use by the CAA for purposes
                                      such as managing, administering and filing details of approvals. It may also assist in the production
                                      and publication of a list of approval holders.
                                      The scope of work, the Products, Parts, or Appliances for which the POA holder is entitled to exercise
                                      the privileges defined in 21.A.163 will be described by the CAA as follows:
                                      FOR PRODUCTS:
                                           1.  General area, similar to the titles of the corresponding certification codes.
                                           2.  Type of Product, in accordance with the type-certificate.
                                      FOR PARTS AND APPLIANCES:
                                           1.  General area, showing the expertise, e.g., mechanical, metallic structure.
                                           2.  Generic type, e.g., wing, landing gear, tyres.































             21.A.153                Changes to the terms of approval
                                      Each change to the terms of approval shall be approved by the CAA. An application for a change to
                                      the terms of approval shall be made in a form and manner established by the CAA. The applicant
                                      shall comply with the applicable requirements of this Subpart.
             21.A.153 AMC            Changes to the terms of approval – Application for a change to the terms of approval
                                      CAA Form 51 (see AMC No 1 to 21.B.240) must be obtained from the CAA and completed in
                                      accordance with the procedures of the POE.
                                      The information entered on the form is the minimum required by the CAA to assess the need for
                                      change of the production organisation approval.
                                      The completed form and an outline of the changed POE, and details of the proposed change to POA
                                      terms of approval must be forwarded to the CAA.
             21.A.153 AMC1-ELA       Changes to the terms of approval – Application for a change to the terms of approval
                                      CAA Form 51 (see AMC No 1 to 21.B.240) should be obtained from the CAA and completed in
                                      accordance with the instructions provided by the CAA. The information entered on the form is needed
                                      by the CAA in order to assess whether the production organisation approval is to be amended. The
                                      completed form should be forwarded to the CAA. The applicant and the CAA can agree on whether
                                      the assessment for a change in approval can be completed via a desktop audit or through a
                                      surveillance audit.
             21.A.157                Investigations
                                      A production organisation shall make arrangements that allow the CAA to make any investigations,
                                      including investigations of partners and subcontractors, necessary to determine compliance and
                                      continued compliance with the applicable requirements of this Subpart.
             21.A.157 GM             Investigations – Arrangements
                                      The arrangements made by the applicant for, or holder of an approval under Part 21 Section A
                                      Subpart G should allow the CAA to make investigations that include the complete production
                                      organisation including partners, sub-contractors and suppliers, whether they are in the State of the
                                      applicant or not.
                                      The investigation may include; audits, enquiries, questions, discussions and explanations, monitoring,
                                      witnessing, inspections, checks, flight and ground tests and inspection of completed products, parts
                                      or appliances produced under the POA.
                                      In order to maintain its confidence in the standards achieved by a POA holder or applicant the CAA
                                      may make an investigation of a sample product part or appliance and its associated records, reports
                                      and certifications.
                                      The arrangements should enable the organisation to give positive assistance to the CAA and co-
                                      operate in performing the investigation during both initial assessment and for the subsequent
     March 2022                                                                                             130 of 260
   125   126   127   128   129   130   131   132   133   134   135