Page 30 - Achievements / Highlights
P. 30

4.   In connection with proposed Doubling between Umdanagar-Mahbubngar section,
                    doubling  work  between  Shadnagar  to  Gollapali  stations  under  Stage-1
                    commissioned with following features:

                       a)  SHNR,  BABR  &  GLY  stations  have  been  provided  with  Centralized
                          Electronic Interlocking of M/s Medha Servo Drives Ltd.
















                       b)  4Block  sections  viz.  TMX-SHNR(S/L),  SHNR-BABR(D/L),  BABR-GLY(D/L)  &
                          GLY-JCL(S/L)  have  been  provided  with  UFSBI  (Deltron  Make)  and
                          HASSDAC (CEL make).


















                       c)  Double distant signals have been provided for both up and down directions at
                          SHNR, BABR & GLY.

                       d)  Standard of Interlocking enhanced from Std II® to Std III ® at BABR station.

                       e)  Air  conditioners  have  been  provided  at  all  three  Electronic  interlocking  relay
                          rooms.

                       f)  A class protection has been provided at SHNR, BABR & GLY.


















                                                            46
   25   26   27   28   29   30   31   32   33   34   35