Page 122 - Performance / Statistics
P. 122
19 Nov-20 Stabling, securing & security of the trains. 11.11.2020 25.11.2020
20 Dec-20 working on running lines & safety at work sites. 01.12.2020 15.12.2020
21 Dec-20 Cab changing procedures and to prevent rolling down of 29.12.2020 12.01.2021
locomotives
22 Dec-20 Ensure safe train operations 30.12.2020 13.01.2021
23 Jan-21 Ensuring safety while executing works adjacent to 02.01.2021 16.01.2021
running lines.
24 Jan-21 Winter season precautions 21.01.2021 19.02.2021
25 Jan-21 Maintainance of Track at Fish plates joints, Glued joints 28.01.2021 11.02.2021
and major Bridges with ballasted deck.
26 Jan-21 Ensure proper insulation is available/provided for the 28.01.2021 11.02.2021
rodding at all manned LCs
27 Jan-21 Ensuring availability of First aid box with standard list of 28.01.2021 11.02.2021
Medicines
28 Feb-21 Maintenance of points and crossings 01.02.2021 15.02.2021
29 Feb-21 Maintainance of Track and Points & Crossings in yards 09.02.2021 10.03.2021
as well as strict observance of rules in shunting.
10. Safety circulars:
Safety circulars are issued regularly to educate the staff to inculcate safety
consciousness and to appraise the staff with latest information. The following 15 Safety
Circulars and 14 General Circulars were issued up to January 2021.
SAFETY CIRCULARS:
No. Subject
1/20 Regarding GLP Check. (G&SR 4.31)
2/20 Non-interlocked working (Appendix-III)
3/20 Station working rules (GR 5.06 and APP.-XIV)
4/20 Precautions to avoid Yard Derailments.
5/20 Prevention of Fire in Passenger Carrying Trains.
6/20 Prevention of SPAD.
7/20 Train operation in case of Loco pilot and/or Guard experiencing any abnormal
Condition in the track, information sabotage or likely sabotage to the
Track/Bridge/fixed installation and obstruction on adjacent line(s).
8/20 Monsoon precautions
9/20 Prevention of Roll back of train during power interception/ loco reversal
1020 Shunting Precautions.
11/20 Knowledge of rules for Gateman – need for intensive counselling.
12/20 Winter precautions.
13/20 Duty for securing safety.
1/21 Disconnection and Reconnection (SR 3.51.6 & App.XIII).
2/21 Detaching Engine.
219