Page 140 - Performance / Statistics
P. 140

SIGNAL AND TELECOM



                 I.       General


                 HYB  division  has  MACLS  with  LED  Signals.  All  the  stations  are  provided  with
                 Integrated  Power  Supply  (IPS)  and  Dataloggers  networked  to  Divisional  and  Zonal
                 HQrs.  On  Telecom  side  the  division  has  100%  6  Quad  underground  cables  for
                 communication.    OFC  provided  in  the  entire  division  except  MJF  BP  –  MLY  GC
                 section.

                 II.   Key information of S&T department

                      Type of Signaling
                       MACLS with Panel and EI                           :      57 (PI-47 & EI-10)
                       a.  Standard III®                                 :      01 (BABR)
                       b.  Standard II ®                                 :      55
                       c.  Standard I                                    :      01 (BDHN)
                      Type of block working

                           Absolute Block Sections                       :      50

                       a.  Single line Token less Block Sections           :    42
                       b.  Single line UFSBI with BPAC                   :      06
                       c.  Double line UFSBI with BPAC                   :      02

                       Automatic Block Sections                          :      07

                      L.C. Gates

                       a.  Total Manned Gates                            :         143
                       b.  Total Interlocked gates                       :      78
                       c.  Mid-Section Interlocked gates                 :      38
                       d.  Station Section Interlocked Gates             :      40
                       e.  Gate Holding Arrangement                      :      11
                       f.  Dead Approach Locking (60sec)                 :      29
                       g.  Sliding Type Boom at Interlocked gates        :      68 (Tfc -39 & Engg-29)
                       h.  Electrically Operated Lifting Barriers        :          25 (Tfc-14 & Engg-11)
                       i.  Approach Warning System                       :      43 (Engg-38 & Tfc-5 Sub Sec)

                     Power Supply Arrangement

                       a.  Full IPS                                      :      57
                       b.  Mini IPS                                      :      44
                       c.  Solar Panels at Stations                      :      11
                       d.  Solar Panels at LC gates                      :      35

                     Data Loggers

                       a.  Stations/Cabin                                :      58
                       b.  LC gates/ Auto Sections/Huts                  :      73 (RTUs)