Page 150 - Performance / Statistics
P. 150

IMPROVEMENTS CARRIED OUT FOR REDUCTION OF FAILURES


                      Replaced  18  Kms     of  Defective    Signalling    Cables  identified    during    annual
                       cable  meggering.

                      Replaced 956 nos.  of various  capacities  of  secondary  cells which  completed
                       their codal life.

                      Replaced 67 Nos. of worn out point machines along with ground connection and
                       insulations.

                      Replaced 176 nos. of worn out panel knobs.

                      Annual  Cable  meggering  completed  at  91  locations  as  per  schedule.  No
                       locations are overdue.

                      System Integrity test carried out at 10 stations as per schedule.  No stations are
                       overdue.

                      Replaced 281 nos. of aspects with Integrated LEDs at 10 stations.

                      Provided 292 Chokes in Relay ends at 07 stations & 05 Auto sections.


































                                                            246
   145   146   147   148   149   150   151   152