IMPROVEMENTS CARRIED OUT FOR REDUCTION OF FAILURES
Replaced 18 Kms of Defective Signalling Cables identified during annual
cable meggering.
Replaced 956 nos. of various capacities of secondary cells which completed
their codal life.
Replaced 67 Nos. of worn out point machines along with ground connection and
insulations.
Replaced 176 nos. of worn out panel knobs.
Annual Cable meggering completed at 91 locations as per schedule. No
locations are overdue.
System Integrity test carried out at 10 stations as per schedule. No stations are
overdue.
Replaced 281 nos. of aspects with Integrated LEDs at 10 stations.
Provided 292 Chokes in Relay ends at 07 stations & 05 Auto sections.