Page 18 - Performance / Statistics
P. 18

8.  Performance:


                                                                         Till Feb          % Improvement
                  S.                      Achieved  Target for                2021
                  No.     Parameter       2019-20      20-21     Actual                    Over      Over
                                                                 19-20  Target  Actual    Target  Last year
                  1.   Asset Failures        50          36      44      33       13       -60.6    -70.45

                       DEMU        DPC      9.74        11.8     10.0    11.8     7.15    -39.41    -28.15
                  2.
                       Ineffective   TC     3.48         5.5     3.51    5.5      4.80    -12.72     36.75

                       DEMU
                  3.                          -           -      -       0.67     -          -         -
                       Punctuality loss


                 9.  INFRASTRUCTURE:

                      08 Loco/DEMU Capacity Schedules Bays with EOT Cranes.
                      06 Locos/DEMU CapacitySchedules Bays with EOT Cranes.
                      02 Pit lines of 08DEMU Coach Capacity.
                      04 Under truck Pit lines of 02 Loco/DEMU Capacity for Major Repairs with EOT
                        Cranes.
                      01 Coach length Pit with covered shed for SPART/SPMRV maintenance
                      Loco/DEMU Turn table.
                      HSD oil installation of 200 KL capacity RCD operated by M/S BPCL
                      Bulk Lube oil installation of 100 KL capacity
                      Effluent Treatment Plant of 5000 Ltrs/Hour capacity.
                      Incinerator of 50 kg/Hour Capacity.


                 10. IMPORTANT M&P:

                      Under floor CNC Wheel Lathe (BG)
                      Fork Lift Truck
                      Whiting Jacks
                      Road mobile cranes



                 11. IMPORTANT TEST EQUIPMENTS:

                      Computerized Water Load Box
                      Spectrometer for testing lube oil
                      Loco Fuel Injection Pump Test Stand
                      Speedometer Test Stand
                      Ferrous debris monitor
                      Computerized SFC recorder
                      Steam boiler for blowing of radiators
                      Head light focus adjustment and luminous intensity test stand
                      Integrated Test Unit for DEMU LCC, Actuator and PT pump
                      Computerized combined DEMU mobile load testing equipment