Page 18 - Performance / Statistics
P. 18
8. Performance:
Till Feb % Improvement
S. Achieved Target for 2021
No. Parameter 2019-20 20-21 Actual Over Over
19-20 Target Actual Target Last year
1. Asset Failures 50 36 44 33 13 -60.6 -70.45
DEMU DPC 9.74 11.8 10.0 11.8 7.15 -39.41 -28.15
2.
Ineffective TC 3.48 5.5 3.51 5.5 4.80 -12.72 36.75
DEMU
3. - - - 0.67 - - -
Punctuality loss
9. INFRASTRUCTURE:
08 Loco/DEMU Capacity Schedules Bays with EOT Cranes.
06 Locos/DEMU CapacitySchedules Bays with EOT Cranes.
02 Pit lines of 08DEMU Coach Capacity.
04 Under truck Pit lines of 02 Loco/DEMU Capacity for Major Repairs with EOT
Cranes.
01 Coach length Pit with covered shed for SPART/SPMRV maintenance
Loco/DEMU Turn table.
HSD oil installation of 200 KL capacity RCD operated by M/S BPCL
Bulk Lube oil installation of 100 KL capacity
Effluent Treatment Plant of 5000 Ltrs/Hour capacity.
Incinerator of 50 kg/Hour Capacity.
10. IMPORTANT M&P:
Under floor CNC Wheel Lathe (BG)
Fork Lift Truck
Whiting Jacks
Road mobile cranes
11. IMPORTANT TEST EQUIPMENTS:
Computerized Water Load Box
Spectrometer for testing lube oil
Loco Fuel Injection Pump Test Stand
Speedometer Test Stand
Ferrous debris monitor
Computerized SFC recorder
Steam boiler for blowing of radiators
Head light focus adjustment and luminous intensity test stand
Integrated Test Unit for DEMU LCC, Actuator and PT pump
Computerized combined DEMU mobile load testing equipment
117