Page 420 - B2B All Year Round Vol.8
P. 420
Within a 7kw power grid, up to five chargers can be installed.
● As the number of electric vehicles increases, the expansion is getting easier.
● Reduce the costs of both the installation and the operation compared
to conventional chargers
Grid Grid
7kW 7kW 7kW 7kW 7kW
Electricity Meter
Electricity Electricity Electricity Electricity
Meter Meter Meter Meter
Charger 1 Charger 2 Charger 3
Dedicated Power Shared Power
Traditional Charger EVAR Smart Charger
Dynamic Load Balancing Intelligent Mesh Network
01 02
Adjustment of the charging capacity by the synchronization Automatic recognition of equipments in the network
with the current status of recharging an EV battery and sharing the real time status of recharging
Recharging
a vehicle
(Max. Power) Cloud
Recharging
multiple numbers
at the same time
(Load Balancing)
Auto Discovery & Grouping P2P Edge Computing
03 04
No additional works of connection needed thanks to Easy to connect with any service provider
the auto-recognition of a charger within the network Smart Charger works offline, too.
Local
Service
Automatic
Control Provider
Electric
Power Cloud
Load
User Authentification
/ Billing
Automation of the
core function
www.evar.co.kr