Lower Thames Crossing – 7.3 Section 106 Agreements – Heads of Terms
Context
Volume 7
      3.1.1 The key relevant National Policy Statements (NPSs) for the Project are the NPS for National Networks (NPSNN) and the Overarching National Policy Statement for Energy (NPS EN-1) and these contain provisions on planning obligations. Paragraph 4.10 of the NPSNN and Paragraph 4.1.8 of NPS EN-1 state that the Secretary of State may take into account any development consent obligations agreed with the local authority. These must be:
a. necessary to make the development acceptable in planning terms
b. directly related to the proposed development
c. fairly and reasonably related in scale and kind to the development.
3.1.2 These draft Heads of Terms should be read in conjunction with the DCO application including the requirements set out in Schedule 2 of the Draft DCO (Application Document 3.1).
3.1.3 National Highways has had regard to policy in the NPSNN and NPS EN-1 in the preparation of this document. Justification and compliance with the policy tests for each obligation is set out in Appendix A. All of the obligations set out within these draft Heads of Terms are considered to comply with the policies relevant to planning obligations.