Page 10 - 7.3 Section 106
P. 10

Lower Thames Crossing – 7.3 Section 106 Agreements – Heads of Terms
Site
Volume 7
      5.1.1 The land to be bound to this agreement by the planning obligations is land which forms the permanent route alignment of the A122 Lower Thames Crossing. This is sufficient land to secure the obligations. Part of this land is currently owned by National Highways with compulsory acquisition powers being sought through the DCO for those sections that are not currently owned by National Highways.
5.1.2 Should additional planning obligations be included at a later date, the land to be bound by the section 106 agreement will be revisited and may include land not proposed as part of the permanent route alignment of the Project but additional land within the Order Limits.
   Planning Inspectorate Scheme Ref: TR010032 Application Document Ref: TR010032/APP/7.3 DATE: October 2022
6
Uncontrolled when printed – Copyright © - 2022 National Highways Limited – all rights reserved