Page 5 - Slaid P04-30Jan2022_Slide
P. 5

BIL.                               PERKARA                                            KOS (RM)**



        1.     Preliminaries and General Requirement                                                      30,000.00

        2.     Uninterruptible Power Supply (UPS)                                                       170,000.00
        3.     Precision Cooling System (PAC) include                                                  *465,600.00
               Pendawaian                                                   Add your words here,according to your need to draw the


        4.     Environmental Monitoring System (EMS)                        text box size.Please read the instructions and more
                                                                                                          94,604.00
                                                                                                        233,880.00
        5.     Containment and Racking System                               work at the end of the manual template.
        6.     Relocation Existing Server Rack                                                            51,450.00

        7.     Electrical works                                             Add your words here,according to your need to draw the
                                                                                                        122,500.00
                                                                            text box size.Please read the instructions and more
        8.     Fire suppression System IG55 & High Sensitivity                                          342,800.00
               Smoke Detection                                              work at the end of the manual template.


        9.     Civil Works                                                                              181,950.00

        10.    Network Cabling                                                                          132,540.00
                                                                         JUMLAH                      1,825,324.00

     *item no.3 -Precision Cooling System (PAC) include Pendawaian dalaman

                              perbincangan semula dengan BKP  bagi
                                kerja-kerja penyenggaraan tahun 2022


    ** Berasaskan kajian pasaran tahun 2021
   1   2   3   4   5   6   7   8   9   10