Page 5 - Slaid P04-30Jan2022_Slide
P. 5
BIL. PERKARA KOS (RM)**
1. Preliminaries and General Requirement 30,000.00
2. Uninterruptible Power Supply (UPS) 170,000.00
3. Precision Cooling System (PAC) include *465,600.00
Pendawaian Add your words here,according to your need to draw the
4. Environmental Monitoring System (EMS) text box size.Please read the instructions and more
94,604.00
233,880.00
5. Containment and Racking System work at the end of the manual template.
6. Relocation Existing Server Rack 51,450.00
7. Electrical works Add your words here,according to your need to draw the
122,500.00
text box size.Please read the instructions and more
8. Fire suppression System IG55 & High Sensitivity 342,800.00
Smoke Detection work at the end of the manual template.
9. Civil Works 181,950.00
10. Network Cabling 132,540.00
JUMLAH 1,825,324.00
*item no.3 -Precision Cooling System (PAC) include Pendawaian dalaman
perbincangan semula dengan BKP bagi
kerja-kerja penyenggaraan tahun 2022
** Berasaskan kajian pasaran tahun 2021