Page 94 - PH_Masonry_Final_Ver 1_July 2020
P. 94
Larsen & Toubro Ltd – ECC Division
Construction Skills Training Institute
Assessment Sheet – Masonry
F12 - Construction of Detached Pier
Name : Batch : Roll No : Allotted Time :
Minutes.
Instruction to Trainees :
Study the given sketch, standards, permitted tolerance and allotted time.
Select and use the required safety gadgets, tools, materials, consumables
and small Equipment‘s.
Construct one brick thick free standing pier as per sketch.
The Joints are to be “Weather Struck” pointing.
Sketch / Drawing :
Small
Safety Gadgets Tools Materials Consumables
Equipment’s
Participant Handbook : Masonry 94