Page 94 - PH_Masonry_Final_Ver 1_July 2020
P. 94

Larsen & Toubro Ltd – ECC Division

                                       Construction Skills Training Institute
                                           Assessment Sheet – Masonry


                                        F12 - Construction of Detached Pier
                 Name :                               Batch :      Roll No :      Allotted Time :

                                                                                             Minutes.
                 Instruction to Trainees :

                       Study the given sketch, standards, permitted tolerance and allotted time.

                       Select and use the required safety gadgets, tools, materials, consumables
                       and small Equipment‘s.
                       Construct one brick thick free standing pier as per sketch.

                       The Joints are to be “Weather Struck” pointing.
                 Sketch / Drawing :







































                                                                                             Small
                  Safety Gadgets         Tools         Materials      Consumables
                                                                                        Equipment’s












         Participant Handbook : Masonry                                                                       94
   89   90   91   92   93   94   95   96   97   98   99