Page 3 - Area 9 - PPP
P. 3
PARAMETER A – LAB0RATORIES, SHOPS/FACILITIES
1. SYSTEM-INPUT AND PROCESSES
THE LOCATION 0F THE LABORATORY ROOMS AS SHOWN IN THE
APPROVED BUILDING PLAN CONFORMED WITH THE NATIONAL BUILDING
C0DE 0F THE PHILLIPINES.
2. IMPLEMENTATION
LIST 0F CHED REQUIRED LAB0RAT0RIES
PLEASE CHECK
CHED REQUIRED LAB0RAT0RIES EXISTING N0T REMARKS
EXISTING
50 HECTARES FOR INSTRUCTION
AND RESEARCH / AVAILABLE
SOIL SCIENCE LABORATORY
/ AVAILABLE
GREEN HOUSE / AVAILABLE
SCREEN HOUSE / AVAILABLE
CHEMISTRY LABORATORY / AVAILABLE
BI0L0GY LAB0RAT0RY / AVAILABLE
C0MPUTER LABORATORY A & B / AVAILABLE
INTERNET LABORATORY / AVAILABLE
EACH LABORATORY ARE EQUIP WITH FIRE EXTINGUISHER, FIRST AID
KITS AND WITH APPROPRIATE EQUIPTMENTS AND SUPPLIES
The first aid kit and fire extinguisher at the chemistry lab0rat0ry

