SOQ No. 202496 CITY OF TUCSON Tab A
During pre-construction, our Safety During the pre-construction phase of each
subcontractors will learn the true scope Management project, we will develop a comprehensive
of work, products to be used or installed, Safety will remain our number one master safety plan specific to the
and the expectations of the project team. priority on the Fire Station No. 8 project. project. All subcontractors and vendors
CORE’s project team will carefully We can assure the City that we will providing goods and services on the
review submitted shop drawings and successfully complete your project using project will be required to participate
product data information received from safe construction practices. Recognizing in a mandatory pre-construction safety
subcontractors prior to submitting for that the construction profession is one meeting. During this meeting, there
design review and approval. Our team of substantial risk, we take all aspects will be a detailed presentation of the
will implement a construction quality of the business, from safety to contract Master Safety Plan outlining individual
control plan modeled after the Army compliance, very seriously. requirements. All subcontractors and
Corp of Engineers. The Corp’s plan vendors are contractually required to
includes three phases: preparatory As a result of this attention to safety, indicate their written understanding of,
phase, initial phase and follow-up phase. CORE has been able to maintain a and agreement with, the Master Safety
In order to augment this plan 0.61 average EMR over the past three Plan prior to starting their construction
and incorporate it starting in pre- years, which is well below the industry activities.
construction, our team has created an average of 1.0.. CORE will continue this
additional phase, the pre-preparatory same commitment to safety as we work In addition, regular safety meetings will
phase. As part of this process, our team closely with the City to identify and be conducted to continually identify
has a pre-preparatory phase checklist manage all risk-related issues for the potential project hazards, as well as
that puts quality control at the forefront project. Our team will recruit input from fire department access routes and other
of our discussion. Discussing quality local, key subcontractors during the best practices throughout construction.
with the subcontractors before they are pre-construction phase of the project to Job site fencing and warning signs will
officially awarded a contract that allows enhance our efforts in predicting safety be installed prior to the start of any
quality to become one of the criteria by risks well in advance of commencing construction activities. All tradesmen
which we choose subcontractors. construction. and visitors are required to wear safety
vests, hard hats and eye protection
without exception. Daily inspections
This software allows CORE to identify potential
hazards on site and ultimately prevent
workplace injuries. Predistive Solutions is
installed on superintendents iPhone’s to
evalute and report on safety conditions daily.