Page 18 - Pdf Final Change 01
P. 18
Rapid Deployment Relocatable Standpipe A clever, robust standpipe construction, designed and extensively tested to ensure performance in the harshest and most remote environments. Rapid & Safe Deployment Rapid deployment means Liquimech standpipes are perfect for civil, mining and industrial projects where the worksite continues to move throughout the duration. Size Available in 6 standard sizes 4.2M - 8.5M Easily moved with integrated fork pocket, and rated lifting eyes. allowing for a 6 x 4 watercart up to a 789 Assembled in less than fifteen minutes, tanker. thanks to Liquimech's proprietary Patent Options pending folding design. Hot dip galvanised, duplex coated, stainless No need for personnel to be working under steel or HDPE constructions Liquimech has a suspended loads or use of EWP's to install, unit to suit any requirement, all manufactured minimising risk. to handle the harshest of environments. Modularised to enable the standard unit to be Construction easily adapted to work in high wind zones as per AS/NZS1170. Liquimech standpipes sport a super strong and robust construction designed and developed as always, through our core mantra’s of Increased Safety, Increased Productivity, Decreased Downtime and Savings on Operational Costs. 1300 954 202 sales@liquimech.com.au 6 18
   13   14   15   16   17   18   19   20   21   22   23