Page 73 - Demo
P. 73

 The Hong Kong Section of the Guangzhou-Shenzhen- Hong Kong Express Rail Link
v In operation since 2018;
  Hong Kong
Mainland China
                  v Linking Hong Kong with the 35,000 km national high-speed rail network;
v Hong Kong Section (26km) running from West Kowloon to Shenzhen; v Slashing journey time between Hong Kong and Guangzhou to
46 mins with a top speed of 200kmh in the Hong Kong Section; v Convenient for doing business, studying and travelling
  HKCONNECT 2020/21 71
   #CONNECTED


























































































   71   72   73   74   75