Page 3 - Rover Pro Setup
P. 3

Out of the Box




















































         •  Lifts out of the crate with a forklift


         •  Film Carriage is already installed on the mast



         •  Control Panel is already installed


         •  The Guide Arm is already installed
   1   2   3   4   5   6   7   8