Page 15 - De Zwartland e-brochure DRAFT
P. 15
RETAIL CENTRE - Tenant List
GLA
Tenant Category
1. THE DESIGN ON THIS DRAWING IS COPYRIGHT AND REMAINS THE
Shop no.
PROPERTY OF THE ARCHITECT.
Shop 1
T.B.C
2. ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE N.B.R.
SANS 10400 AND LOCAL AUTHORITY REGULATIONS
Restaurant/ Coffee shop
266m 2
Shop 2a
T.B.C
(lower level)
3. THE DRAWING IS NOT TO BE SCALED
Restaurant/ Coffee shop
266m 2
Shop 2b
T.B.C
(upper level)
4. ANY DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO THE
Phase 2a
ARCHITECT
Restaurant/ Coffee shop
173m 2
Shop 3
T.B.C
5. ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITE PRIOR TO
Shop 4
CONSTRUCTION.
Restaurant/ Coffee shop
T.B.C
161m 2
234m 2
Restaurant/ Coffee shop
Shop 5
T.B.C
T.B.C
176m 2
Restaurant/ Coffee shop
Shop 6
Shop 7
T.B.C
699m 2
Pharmacy
Health
Shop 8
156m 2
T.B.C
126m 2
Shop 9
T.B.C
Clothing
T.B.C
Clothing
Shop 10
177m 2
Shop 11
Clothing
T.B.C
112m 2
112m 2
Shop 12
Luggage
T.B.C
T.B.C
Shop 13
112m 2
Footwear
241m 2
Homeware/ Furniture
T.B.C
Shop 14
67m 2
T.B.C
Printing & Postage
Shop 15
Hair Salon
67m 2
Shop 16
T.B.C
Jewellery
78m 2
Shop 17
T.B.C
355m 2
Bank
T.B.C
Shop 18
83m 2
Service
Shop 19
T.B.C
Liquor Store
245m 2
T.B.C
Shop 20
Fragrance
27m 2
Shop 21a
T.B.C
26m 2
Accessories
Shop 21b
T.B.C
27m 2
Service
Shop 22a
T.B.C
T.B.C
26m 2
Service
Shop 22b
51m 2
Gadgets/ Security
Shop 23
T.B.C
Pet Shop
46m 2
Shop 24
T.B.C
Shop 25
Computers
T.B.C
53m 2
Cellphone/ Travel
T.B.C
22m 2
Shop 26a
Computer Supplies
T.B.C
Shop 26b
26m 2
86m 2
T.B.C
Convenience Food
Shop 27 Restaurant/ Coffee shop Proposed Tenant 248m 2 NOTES:
Phase 1 Shop 28 Convenience Food T.B.C 31m 2 RevID ChID Change Description Date
1
26-06-19
Updated Showroom site/ Office site
T.B.C
31m 2
Cigars/ Cigarettes
Shop 29
Site Plan 37m 2 2 3 4 Updated plan 14-08-19
Shop 30
Biltong shop
T.B.C
Updated plan
20-08-19
2 667m 2
27-08-19
Updated GLA Schedule
T.B.C
Shop 31
Food Anchor
5 Added Tenant list GLA Schedule 28-08-19
STOP Shop 32 Convenience Food T.B.C 40m 2
Amended size of Shop 1
G Optometrist 40m 2
Shop 33 T.B.C Amended area of tenant 61 (sapoa)
ERF 11233 Substation Shop 34 Optometrist T.B.C 40m 2 6 7 Amended parking layout 03-09-19
04-09-19
Amended parking layout
Shop 35 Books T.B.C 75m 2 8 Amended Office layout, roads reconfigured 21-11-19
New terraforce to eng. detail Office Block 2 Convenience Food/ 31m 2 10 Updated layout and mall GLA schedule 07-04-20
restaurant layout
SITE BOUNDARY
B 5m BUILDING LINE Shop 36 Service T.B.C 31m 2 9 Updated layout 12–03-20
31m 2
T.B.C
Cellphone
Shop 37
STOP
Updated GLA schedule
13-05-20
11
Piketberg street 1 496m 2 13 Shifted Car showroom footprint 1m towards main entrance 04-06-20
C Office Block 1 1 496m 2 Shop 38 Travel T.B.C 262m 2 12 Updated Car showroom footprint 29-05-20
Clothing
T.B.C
Shop 39
20m road reserve Servitude Proposed 10m Shop 40 Clothing T.B.C 262m 2 14 Added stair, ATMs & split S21-22 & S26 28-06-20
Shop 41
T.B.C
264m 2
Bank
D F wide Stormwater Proposed New link road ERF
Shop 42 Clothing T.B.C 264m 2
S 2b Office Block 3
268 m 2 2654 Shop 43 Bank T.B.C 264m 2
E 1 496m 2 Owner:
16
Shop 44 Hardware/ Furniture T.B.C 201m 2
5m BUILDING LINE
12
6 Shop 45 Hardware T.B.C 182m 2
12
bays
Proposed 10m wide Stormwater Servitude 176 m 2 BIKE BAY MOTOR STOP 12 STOP 2 STOP Shop 46 Storage T.B.C 92m 2 Date:
6 New Parking
S 6
93m 2
T.B.C
Shop 47
Storage
FUTURE 69 New Parking bays STOP 9 0m BUILDING LINE
DEVELOPMENT 15 STOP Shop 48 Storage T.B.C 93m 2 Architect:
S 5 V/C Shop 49 Storage T.B.C 93m 2
234 m 2 STOP STOP STOP Car Showroom
STOP Lower Ground floor 336m 2 Shop 50 Storage T.B.C 93m 2
25
STOP Ground floor 2 501m 2
S 9 26 Mezzanine floor 581m 2 Shop 51 Storage T.B.C 93m 2 OSMOND LANGE
ARCHITECTS + PLANNERS
126 m 2 Date:
STOP 26
Shop 52 Centre Management 141m 2
S 10 11 STOP 55m 2 Engineer:
177 m 2 Shop 53 Pool Supplies/ Gun Shop T.B.C
S 7
52 New Parking bays
Pharmacy 26 1 4 Mini- Tenant 54a ATMs T.B.C 30m 2
43 699 m 2 S 11 521 New Parking bays sub STOP STOP
112 m 2 STOP 26 6
39 6 STOP S 12 STOP Tenant 54b Ground Floor T.B.C 1 928m 2
169 New Parking bays L 112 m 2 covered walkway LANDSCAPING Tenant 54c Lower Ground Floor T.B.C 633m 2 Date:
43 12
S 13 26 12
Toilets 112 m 2 ERF 11203 Phase 2b Consultants offices
STOP
119 m 2 S 8 32 STOP 26 11 passages) ARCHITECT:
39 Tenant 55 (excl. reception and Medical suites 1 101m 2
STOP
27 9 156 m 2
V/C S 14 STOP Tenant 56 Fast Food T.B.C 278m 2 Osmond Lange Architects and Planners
240 m 2 5 (Pty) Ltd Cape Town
14 2778m 2
STOP
walkway 26 11 Tenant 57 Multi- Purpose Area T.B.C
L 6 STOP Fast Food Postal: PO Box 499, Belville, 7535
S 17 S 16 S 15 STOP 278 m 2 Tenant 58 Lower Ground- Storage T.B.C 180m 2 Address: Tyger Terraces II, First Floor, Belville, Cape Town
78 m 2 66 m 2 66 m 2 26 11 E-mail: info@osmondlange.co.za
TROLLEY
ARCHITECTS + PLANNERS
STOP BAYS STOP STOP (excluding Shop 52- 141m 2 ) 16 837m 2 OSMOND LANGE Tel: +27 (0) 21 948 1877 / 0861 652 643
Fax:
+27 (0) 21 948 3455
S 18 Total GLA
SITE BOUNDARY
Future ward 355 m 2 STOP STOP STOP PORTION 1 OF
6
S 19 S 21a S 21b S 22b S 22a 26 11 8 PROJECT:
26 m 2 26 m 2 27 m 2
L 83 m 2 27 m 2 STOP 26 11 10 STOP ERF 327
Mini- S 23 1 2 3 4 5 6 7 S 24 23 New Parking bays 2
8
46 m 2
51 m 2
sub S 20 Custom Te DOWN UP t Custom Text UP STOP 15 4 104 m
DOWN
1 2 3 4 5 6 7 8
x
245 m 2 S 25 S 26b S 26a TROLLEY
BAYS
53 m 2 26 m 2 22 m 2 TROLLEY BAY STOP
23 11 10 covered walkway STOP
5m BUILDING LINE
Link FEATURE 23 MOTOR MOTOR PROPOSED
BIKE BAY
ABOVE
BIKE BAYS
Hospital FEATURE
6 498m 2 ABOVE STOP NEW SHOPPING CENTRE
S 27 S 28 S 32 S 33 S 34 S 35 covered walkway STOP & HOSPITAL
31 m 2 S 29 S 30
86 m 2 31 m 2 37 m 2 40 m 2 40 m 2 40 m 2 75 m 2 STOP
S 36 S 37 S 38 STOP
31 m 2 31 m 2 31 m 2
Mini- S 39 S 40 S 41 S 42 S 43 S 44 S 45 STOP J
Plant sub 262 m 2 262 m 2 264 m 2 264 m 2 264 m 2 201 m 2 182 m 2 T 54b 20m BUILDING LINE
rooms Service Yard S 31 1 928 m 2 Ground Floor + CLIENT: DEVMARK Development Services (Pty) Ltd
185m 2 Anchor 632 m² Lower Ground Floor =2 631 m²
6 6 2 667 m 2 T54a Optional Delivery Area SITE: ERF 11203 MALMESBURY
S 46 S 47 S 48 S 49 S 50 S 51 S 52 30 m 2 ( A 10Ha PORTION OF PORTION 3 OF FARM 696, TWEEFONTEIN)
HELI-
STOP/ DELIVERY 92 m 2 93 m 2 93 m 2 93 m 2 93 m 2 93 m 2 141 m 2 TOILETS S 53 DRAWING TITLE:
87 m 2 VC
20 New Parking bays TRUCK YARD 55 m 2 SITE BOUNDARY SITE PLAN | Proposed Ground Floor Leasing layout
TURNING
CIRCLE
fence/ line L Loading area L L Loading area L 166 Overflow
A Parking bays N7 HIGHWAY OFF RAMP
8 New Parking bays 20m BUILDING LINE
fence/ kerb line fence/ kerb line STOP K
Mini-
South West Elevation BUILDING CLASSIFICATION CLIMATIC ZONE
35 New Parking bays sub
A1/ A2/ E2/ F1/ G1 4
L
fence line
fence line RESPONSIBLE PERSON DATE APPROVED
P SITE BOUNDARY N M DESIGN F Nortje, P du Toit 2020/06/29
DRAWN P du Toit, K Stainbank
FOR DISCUSSION
DRAWING PATH
/Volumes/Projects/Avna Projects/Projects/CT1221 Malmesbury Mixed-use Development/
200 Production/210 Drawing/211 Current/LEASING LAYOUT SITE PLAN 2020-04.pln
N7 HIGHWAY
SCALE SHEET SIZE
TN 1:1000, 1:500 A1
7 PROJECT No. DRAWING NUMBER REVISION
Ground Storey Plan CT1221 1105 14