Page 10 - MHB Flipbook
P. 10

3D Modelling &






                   Visualisation







                                                                                 Suggits Lane Footridge, Cleethorpes


    Contact Us                           Capabilities


    Craig Brash                          The accurate and clear presentation of design information is vital to
    Senior Engineer                      the success of any construction project. Traditionally this has been
                                         done through the use of 2D-drawings, and whilst this is likely to
    craig.brash@                         continue for the foreseeable future, MHB are increasingly asked to
    mhbconsultants.com                   provide 3D-models of schemes throughout the project lifecycle.

    0131 374 4011                        Typical applications are:
                                             At planning stage, rendered models can assist non-technical
                                             stakeholders to visualise the finished project.
                                             At construction stage, 3D-models can be used to plan
                                             construction sequences, develop method statements and assist
                                             with clash detection. The model can also be used to generate
                                             conventional construction drawings, and as with any underlying
  Cill Beam                                  3D-model, any changes will automatically update the
                                                                                       Auch Viaduct Bridge
  Cockies Yetts Underbridge
                                             construction drawings.                       Refurbishment
                                             After the project has been built the client will inherit a valuable
                                             tool to manage their asset for the years to come. The 3D model
                                             (digital twin) can be used with asset management systems
                                             allowing the owner to manage maintenance scheduling to
                                             reduce operational costs.

                                         The investment cost in developing the 3D-model pays for itself
                                         through more efficient design, increased collaboration and reduced
                                         construction costs by adopting 4D programming and scheduling.
  Arkleston Footbridge, Paisley          The involvement at an early stage of our in-house surveying team
                                         can provide the baseline information through traditional survey
                                         techniques or laser scanning.


                                         We can work with any preferred software and BIM systems to
                                         provide a cost-effective solution to any project.






  Balnagown, Invergordon


    mhbconsultants.com                   Glasgow | Edinburgh | York | London
   5   6   7   8   9   10   11   12