Page 143 - ENGLISH PR REPORT FEBRUARY 2024
P. 143
2/27/24, 10:29 AM Dubai initiates project worth Dhs112m to develop Dubai Creek pier, upgrade support walls - TrendRadars
flooding during harsh weather conditions. This effort aims to minimize disruptions to commercial traffic caused
by flooding or bad weather.
The project is set to be implemented in two phases, with the initial phase involving the restoration of a 2.1 km
stretch along the Deira side of Dubai Creek.
The site will be divided into multiple sections, and each segment will be sequentially patterned to ensure
uninterrupted docking traffic. The second phase will cover a 2.3 km length on the Bur Dubai side.
Global ReputationDawoud Al Hajri, Director-General of Dubai Municipality, stated that the project highlights
Dubai Municipality’s commitment to transforming Dubai into a more attractive and innovative city by
enhancing various elements and services it offers through the strategic and sustainable development of all
coastal facilities and infrastructure in the Emirate.
The goal is to solidify Dubai’s position as a global tourism hub and augment its economic and commercial
prosperity.
Al Hajri said, “The project is set to improve security and safety measures for maritime traffic and commercial
operations within Dubai Creek. As a significant symbol of the city’s growth, Dubai Creek serves as a vibrant
artery at the heart of Dubai. Facilitating the passage of over 13,000 ships annually, it plays a key role in
fostering the economic and social prosperity of the emirate. Additionally, the creek further supports commercial
dealings with neighbouring markets in the region.”
“We have implemented several measures to mitigate the risks posed by climate change and rising sea levels,
closely monitoring changes on both sides of the creek. Furthermore, we have conducted technical studies to
devise construction designs that can enhance the efficiency of the marine docks on both banks.
These designs adhere to the highest global standards, ensuring the preservation of the supporting walls’ stability
and safeguarding against increased flooding during seasonal weather conditions.” Al Hajri added.
Comprehensive workThe project”s 14-month timeline includes the restoration of the 2.1 km Deira pier, which
involves replacement and the rehabilitation of damaged sections of the concrete wall, reaching a depth of 8
meters and increasing its height to 3 meters.
These improvements aim to ensure the safe docking of ships in the area.
By initiating this project, the Municipality aims to enhance services and facilities for safe docking and
navigation, which will be ensured through the provision of 200 anchors across the dock.
Dubai Creek is one of the most vital historic maritime channels in the Emirate, marking the initiation of Dubai’s
trade interactions with the world over a century ago.
Despite the extensive development in the Emirate of Dubai, the Creek continues to maintain its historical,
commercial, and economic importance, along with modern projects prevalent in the emirate, in addition to
serving as a significant tourist hub for residents, visitors, and tourists.
WAM
https://www.trendradars.com/h/article-348996-dubai-initiates-project-worth-dhs112m-to-develop-dubai-creek-pier-upgrade-support-walls/#google_vign… 2/2