Page 259 - ENGLISH PR REPORT FEBRUARY 2024
P. 259

Dubai Municipality, overseeing a project costing Dh112 million, plans to implement it in two
               phases. The initial phase will restore a 2.1km stretch along the Deira side of Dubai Creek.
               The site will be divided into multiple sections, with each segment being sequentially
               patterned to ensure uninterrupted docking traffic. The second phase will encompass a
               2.3km length on the Bur Dubai side.

               The project will also include the installation of 200 anchors along the creek to ensure the
               provision of safe navigation services and facilities.


               Artery of Dubai:

               The Dubai Creek, symbolizing the city’s growth, serves as an artery at the heart of Dubai,
               facilitating the passage of over 13,000 ships annually.

               “The project is set to improve security and safety measures for maritime traffic and
               commercial operations within Dubai Creek,” said Dawoud Al Hajri, Director General of
               Dubai Municipality. “[The Creek] plays a key role in fostering the economic and social
               prosperity of the emirate. Additionally, the creek further supports commercial dealings with
               neighboring markets in the region.”


               He also declared that the Dubai Municipality is committed to transforming Dubai’s coastal
               facilities and infrastructure. The goal is to solidify Dubai’s position as a global tourism hub
               and enhance its economic and commercial prosperity.


               “We have implemented several measures to mitigate the risks posed by climate change and
               rising sea levels, closely monitoring changes on both sides of the creek,” he added.
               “Furthermore, we have conducted technical studies to devise construction designs that can
               enhance the efficiency of the marine docks on both banks. These designs adhere to the
               highest global standards, ensuring the preservation of the supporting walls’ stability and
               safeguarding against increased flooding during seasonal weather conditions.”

               Comprehensive work:

               The project’s 14-month timeline encompasses the restoration of the 2.1 km Deira pier,
               which will involve replacing and repairing damaged sections of the concrete wall, reaching a
               depth of 8 meters and increasing its height to 3 meters.

               These improvements will ensure the safe docking of ships in the area. Dubai Creek, one of
               the most vital historic maritime channels in the Emirate, marks the initiation of Dubai’s trade
               interactions with the world over a century ago.


               Despite the extensive development in the emirate, the Creek continues to maintain its
               historical, commercial, and economic importance, alongside modern projects prevalent in
               the emirate. Additionally, it serves as a significant tourist hub for residents, visitors, and
               tourists.







               https://www.bolnews.com/international/2024/02/dubai-reveals-dh112-million-creek-restoration-
               project-to-prevent-potential-flooding-risks/
   254   255   256   257   258   259   260   261   262   263   264