Page 31 - ENGLISH PR REPORT FEBRUARY 2024
P. 31
fostering the economic and social prosperity of the emirate. Additionally, the creek
further supports commercial dealings with neighboring markets in the region.”
“We have implemented several measures to mitigate the risks posed by climate
change and rising sea levels, closely monitoring changes on both sides of the creek.
Furthermore, we have conducted technical studies to devise construction designs
that can enhance the efficiency of the marine docks on both banks. These designs
adhere to the highest global standards, ensuring the preservation of the supporting
walls’ stability and safeguarding against increased flooding during seasonal weather
conditions.” Al Hajri added.
Comprehensive work
The project's 14-month timeline includes the restoration of the 2.1 km Deira pier,
which involves replacement and the rehabilitation of damaged sections of the
concrete wall, reaching a depth of 8 meters and increasing its height to 3 meters.
These improvements aim to ensure the safe docking of ships in the area.
By initiating this project, the Municipality aims to enhance services and facilities for
safe docking and navigation, which will be ensured through the provision of 200
anchors across the dock.