Page 145 - National Electrical Price Guide
P. 145

09-27-19
                                                                                                                 50-1
                                                           OCAL-BLUE PVC COATED CONDUIT

                                                                       Average        Suggested   LABOR   HOURS
                                    Description    Cat. No.   Cost       Resale     (0-6')   (6-10')  (10-15')  (15-20')

                                    1/2"       COND1/2-G          414.25   669.00     4.00    5.00     6.00     7.00
                                    3/4"           COND3/4-G         480.10   775.00    5.00   6.00    8.00     9.00
                                    1"          COND1-G            621.55   1,004.00     6.00   8.00   9.00    11.00
                                    1-1/4"     COND11/4-G        786.58   1,270.00    8.00   10.00    12.00    14.00
                                    1-1/2"       COND11/2-G         956.60   1,545.00     10.00   13.00   15.00   18.00
                                    2"             COND2-G          1,247.91   2,015.00    12.00   15.00   18.00   21.00
                                    2-1/2"     COND21/2-G       1,889.73   3,052.00    15.00   19.00   23.00   26.00
                                    3"              COND3-G         2,385.50   3,853.00    18.00   23.00   27.00   32.00
                                    3-1/2"              COND31/2-G    2,850.68   4,712.00    20.00   25.00   30.00   35.00
                                    4"                COND4-G        3,438.41   5,553.00     25.00   31.00   38.00   44.00
                                    5"          COND5-G           6,094.86   9,843.00    30.00   38.00   45.00   53.00
                                    6"         COND6-G      7,816.88    13,489.00   36.00    45.00    54.00    63.00

                                                           OCAL-BLUE PVC COATED ELBOWS

                                                                       Average        Suggested   LABOR   HOURS
                                    Description    Cat. No.   Cost       Resale     (0-6')   (6-10')  (10-15')  (15-20')

                                    1/2"        ELL1/2-G      19.94        27.70     0.25     0.31     0.38     0.44
                                    3/4"               ELL3/4-G       20.71   28.75     0.30     0.38     0.45     0.53
                                    1"                  ELL1-G        23.76   32.95     0.35     0.44     0.53     0.61
                                    1-1/4"             ELL11/4-G         28.97   40.50     0.40     0.50     0.60     0.70
                                    1-1/2"              ELL11/2-G     35.61   49.80     0.50     0.63     0.75     0.88
                                    2"                  ELL 2-G     49.68   69.45     0.65     0.81     0.98     1.14
                                    2-1/2"              ELL21/2-G     90.33   130.80     0.85     1.06     1.28     1.49
                                    3"                   ELL3-G    144.29   209.15     1.00     1.25     1.50     1.75
                                    3-1/2"              ELL31/2-G     189.33   274.40     1.30     1.63     1.95     2.28
                                    4"                    ELL4-G   206.01   298.60     1.60     2.00     2.40     2.80
                                    5"                ELL5-G       496.52   719.60     2.00     2.50     3.00     3.50
                                    6"          ELL6-G       904.52      1,310.90    3.00     3.75     4.50     5.25

                                                          OCAL-BLUE PVC COATED COUPLINGS

                                                                       Average        Suggested   LABOR   HOURS
                                    Description    Cat. No.   Cost       Resale     (0-6')   (6-10')  (10-15')  (15-20')
                                    1/2"             CPL1/2-G        6.10   7.70      0.05     0.06     0.08     0.09
                                    3/4"             CPL3/4-G        6.38   8.10      0.06     0.08     0.09     0.11
                                    1"              CPL1-G         8.30   10.50       0.07     0.09     0.11     0.12
                                    1-1/4"        CPL11/4-G            9.66   12.20     0.09     0.11     0.14     0.16
                                    1-1/2"           CPL11/2-G         11.51   15.50     0.10     0.13     0.15     0.18
                                    2"                CPL2-G       16.83   21.30      0.12     0.15     0.18     0.21
                                    2-1/2"              CPL21/2-G     41.66   52.60     0.14     0.18     0.21     0.25
                                    3"                 CPL3-G       50.59   63.90     0.15     0.19     0.23     0.26
                                    3-1/2"          CPL31/2-G          64.92   95.90     0.16     0.20     0.24     0.28
                                    4"                 CPL4-G      75.89   125.70     0.18     0.23     0.27     0.32
                                    5"                CPL5-G       247.26   312.40     0.19     0.24     0.29     0.33
                                    6"          CPL6-G       276.20       348.90     0.20     0.25     0.30     0.35
















                                                  MATERIAL PRICES AND LABOR UNITS FOR CONDUIT ARE PER 100 FT.
                                            MATERIAL PRICES AND LABOR UNITS FOR ELBOWS AND COUPLINGS ARE PER EACH
              NPG                       AVERAGE COST COLUMN IS A NATIONAL AVERAGE AND SHOULD BE VERIFIED FOR YOUR AREA
              5-1                               COPYRIGHT © 1996-2019 by ELECTRICAL RESOURCES, INC.
   140   141   142   143   144   145   146   147   148   149   150