Page 3 - Dycem Minibrochure
P. 3
Length for heavy
traffic loads
FACT Length for normal
traffic loads
With every footstep and wheel
rotation, contamination gradually
builds up in layers.
After 6 footfalls
99.9%or 3 wheel rotations
*
EFFECTIVE
After 4 footfalls
50%or 2 wheel rotations
*
EFFECTIVE
After 2 footfalls Multiple steps on Dycem flooring are
required to fully decontaminate your feet
25%or 1 wheel rotation and wheels. Peel off mats do not have the
* surface area or ability to allow for multiple
footsteps/wheel rotations to guarantee
EFFECTIVE effective decontamination from the built up
layers of contamination.
* Figures shown are ‘up to’ values based on optimum care and use
2
traffic loads
FACT Length for normal
traffic loads
With every footstep and wheel
rotation, contamination gradually
builds up in layers.
After 6 footfalls
99.9%or 3 wheel rotations
*
EFFECTIVE
After 4 footfalls
50%or 2 wheel rotations
*
EFFECTIVE
After 2 footfalls Multiple steps on Dycem flooring are
required to fully decontaminate your feet
25%or 1 wheel rotation and wheels. Peel off mats do not have the
* surface area or ability to allow for multiple
footsteps/wheel rotations to guarantee
EFFECTIVE effective decontamination from the built up
layers of contamination.
* Figures shown are ‘up to’ values based on optimum care and use
2