category (Non-Suburban Grade). At
present two high levels platform with a
length of 400 and 560 M respectively are
available at both stations. The length of the
platforms is adequate for the trains
presently stopping at these stations.
10 Sri Pasunoor Kazipet 06.07.0.2 KAZIPET JUNCTION: 30.03 Remarks : 11.07.2
Dayakar, Hon’ble Junction 022. Commercial Utilisation: It was 022
Member of 30.03.COMMERCIAL constructed under staff welfare amenities
Parliament of UTILIZATION OF RAILWAY and meant for recreation of the staff.
STADIUM AT KAZIPET AND
Warangal PROVISION “SULAB Hence the stadium cannot be taken up
Constituency COMPLEX" under commercial utilization.
SULAB COMPEX: Joint inspection
done and location finalized for Sulab
392
Complex. Memorandum of Understanding
under process.
30.04 RAILWAY STATION
PREMISES ( KAZIPET
JUNCTION)
(i) Purified drinking water
facilities on Platform- 30.04 Remarks:
Establishing the RO plant At present potable drinking water is being
IN & OUT of station area of supplied on platforms for passengers.
Kazipet Junction:
30.07 FOOT OVER BRIDGE 30.07 Remarks:
FROM RRI CENTRE – The feasibility for construction of FOB at
BODAGUTTA END. Kazipet Railway station connecting