Page 44 - HW 1121
P. 44

Code:SS3041065
Code:SS3041265
rive outdoor structures                     For increased drive torque
                                           T FEATURES
ead (Fine
or fixing st
ead locks in hread locks
e Thread clo the screw ush with th decking sli timber shr
section on d also allow
underside the head in of the deck
ail Industries
Now, in spring 2021, with demand certainly no less elevated, thanks in addition to the massive plantings attached to roading projects, deliveries are being pushed even further out.
How are our Christchurch landscapers dealing with this?
FORM Garden Architecture’s Craig Wilson: “I have told some clients to just wait until we can get the right plants – a plastic deck and even artificial turf can work, but plastic plants just don’t!”
Being busy is great for the landscape industry and its players, agrees Landscape Architect Tom Evans at Inside-Out Design (www.iodesign.co.nz), but planting has indeed been a pinch point: “Just being able to get that more advanced growth has been a real issue,” he says.
“A lot of the time we try and try to find an alternative if it’s more cost effective or more readily available, but if it’s not we’re pretty hamstrung in some instances and we just have to wait or pay...”
The broader supply chain being a lot slower means firms like Inside-Out are actively looking at sourcing more products locally. It also means paying more attention to managing expectations with clients and “trying to make sure that you’re not over-promising and under-delivering.”
Sourcing mature plants is also an issue for Ollie Newman
at Onlandscapes, who makes no bones that, although the landscaping business is “frantic” from his perspective, the firm has been experiencing more than the average number of projects stopping and starting.
This isn’t necessarily about shortfalls in landscape products but instead reflects the much talked about delays in and
T
P
H p q d
C
H
W th co
 +ACotaarsleTohfretawd)o threads
   rength for your deck.
 For superior fixing strength for
to the decking, while
any deck, NZ Nails’ new Titan into the timber joist.
Stainless Steel 304 decking screws include a double thread
se to the head of the
 – the Fine Thread locks into
strength and keeps the
 the decking, while the Coarse
e top of the deck. This
 .
as preventing the decking timber moving down the screw shank during shrinkage.
The smooth section on the
Thread locks into the timber
pping down the screw
joist.
inks. Having a Fine Thread close
 the tsoctrheewheandsoufrtehse escarsewy retains the screw strength, while also
s for timber shrinkage
keeping the screw head flush
of deck and top of the
with the top of the deck as well
a constant position
screw ensures easy pull-down and allows for timber shrinkage
Ltd, Mt Wellington, Auckland www.nz between the underside of the deck and top of the joist,
holding the head in a constant position with the top of the deck.
www.nznails.co.nz
Fine Thread
    Coarse Thread
       ype 17 oint
elps the screw
enetrate
uickly into the
eckiTngo. wards a bigger shed
As promised last year, bigger new sizes for Riverlea’s Duratuf
Lifestyle sheds are now available. The largest model is the
6 x 4.8m Oxford (see photo), which at 28.8m2 is just under the 2
ounetwe3r0smulnimkit for unconsented building (provided other local regulations are met).
ead
Delivered in a single crate ready to build, Lifestyle sheds
more fixed or opening aluminium joinery windows, while a quality NZ-made roller door provides secure access for larger items.
Duratuf Lifestyle sheds include extra thick hi-tensile steel
www.duratuf.co.nz
ith nibs under
are available in a wide range of colours, including almost any e hceoamdbfinoartion of cladding and door colour. unterAsdidniktiiongs.can include a pedestrian access door and one or
s.co.nz/products/screws
cladding and durable, high strength laminated roof beams and full timber frames to withstand New Zealand’s wild weather conditions.
nail
shortages of building and construction products facing developers and house builders.
“They might have a hold-up for a month for some framing,” he says. “So, we start and then all of a sudden, we have to leave, so that job is left open ... and it’s hard to get back when they want, because we might have four- or five-week job next up. It’s a bit of a juggling act at the moment.”
On top of the issues around plants, Ollie Newman and his team have experienced their own supply chain disruptions, mainly around timber and steel, however these delays have been of the order of a few days rather than weeks.
Swimming pools are hot right now in Christchurch, the downside being that again demand is outstripping supply: “If you want to put a swimming pool in, you’re waiting months, many months now, just in terms of supply,” says Craig Wilson, adding that demand for backyard pools has “gone off the scale”.
“Swimming pools are huge at the moment,” agrees Ollie Newman, “There wouldn’t be a week go by where we’re not paving around a swimming pool,” he says, sharing that some of the “renovation” work he’s involved in is of such a scale that they are almost as substantial as a completely new build.
It’s clear that there is much happening for these professionals.
Their changing landscape (forgive the pun) includes adapting to be able to achieve more with less, often facing delays and seeking alternative means to an end.
And as usual they’re somewhat at the mercy of other professionals within the building industry.
Are they downhearted? Not a bit, even if they haven’t got the time to lounge around their own swimming pools...
  42 NZHJ | NOVEMBER 2021
MORE AT www.hardwarejournal.co.nz
                                                      d
C
i
s fl e
e n
N







   42   43   44   45   46