Page 5 - FCFupload_Neat
P. 5
ERECTION
The wall panels ship to the job
site and hoist one by one with
light crane and with small crew
on ten erect the
superstructure. Floor system
component also ship to the site
and install with the same crew
(350m2 per shift).
CFS system applies to different
type of construction projects
such as modular buildings,
offices, labor
accommodations, oil and gas
compounds, low and mid-rise
apartments and
condominiums, villas, army
barracks, schools, police
stations, hotels and motels,
vertically add-on floor to
existed building, medical
offices and hospitals, senior
care facilities etc.