Page 18 - BJS Vol 33 & 34
P. 18
8 Bangladesh J. Sugarcane, 33 & 34 : 6-13 August, 2013
The treatments were as follows:
Previously raised single budded soil bed sugarcane settlings were transplanted in
each plot during mid November, 2007 and 2008 with 30 cm interplant spacing in 60 cm
apart paired rows. Spacing between two paired rows was 140 cm. For sugarcane Urea,
-1
TSP, MOP Gypsum and ZnSO 4 were applied @ 206, 127, 160, 90 and 4 kg ha ,
respectively (BARC, 2005). All TSP, Gypsum, ZnSO 4 and one-third MOP were applied in
trench and mixed with soil prior to planting of settling. One-third urea was applied at 21
rd
rd
days after planting (DAT) of setts. The second dose of (1/3 ) Urea and (1/3 ) MOP were
applied as first top dressing at 90 DAT. Final top dressing of rest Urea and MOP were
applied at 150 DAT. Recommended fertilizers also were applied for the intercrops. To
-1
control insect pests, Furadan 5G was applied @ of 40 kg ha in three splits in December,
2008 and 2009, March and May, 2009 and 2010.
Pic: PRC+ Onion – Mungbean Pic: PRC + Cabbage - Mungbean
Pic: PRC + Potato – Mungbean Pic: PRC+ Bushbean - Mungbean