STANDARD COSTING





            Standard Costing Has Two Principal Uses





            • To           value              inventory                   (if        the          standard                  cost


                approximates the actual costs).








            • To act as a control device by establishing standards

                (expected costs) and comparing actual costs with


                the expected costs (variance analysis).







            To avoid meaningless variances standards should be


            continuously reviewed to ensure that they reflect

            current targets.