Page 16 - Manac Costing Test 1 class slides - 2. Variable And Absorption Costing
P. 16

COSTING



                Absorption costing variances










             • Absorbed overhead = Overhead rate x actual units


                  produced

             • Volume variance (Under / over recovery)


                    • Difference between budgeted and actual production in


                          terms of volume

                           = (Actual units – Budgeted units) x Overhead rate


                           or

                           = Absorbed overheads – Budgeted overheads


             • Expenditure variance


                           Difference between budget and actual in Rand terms

                           = Budgeted overheads – Actual overheads



                                                                                                                                    16
   11   12   13   14   15   16   17   18   19   20   21