Page 13 - Capital Allowances Recoupments Part 1 (CTA)
P. 13

Movable assets used in farming or production of


    renewable energy: s 12B – [excluding s 12B(1)(f)]












        Only the generation of electricity from solar energy  will only be allowed in

        following 3 categories




        • Photovoltaic solar energy (solar PV)  of > 1 megawatt

        • Photovoltaic solar energy  (solar PV) of < 1 megawatt

        • Concentrated solar energy (solar CSP)




        • Rates:

        • Machinery used in solar PV < 1 megawatt - 100% allowance

        • All other – 50:30:20