Page 71 - Audit Day 3 - Class Slides
P. 71
Test of controls
• The operating effectiveness of a control consists of
two components:
• Design: The control can prevent, detect and correct a
material misstatement.
• Implementation: The control exists and the entity is
using it.
• Refer to ISA 315 (revised) paragraph A74 to A76
for a discussion of the nature and extent towards
the understanding of relevant controls.

