Page 87 - F5 Slides 2017-18
P. 87

High-low








             1: Select the highest and lowest activity levels, and their


                 costs.


             2: Find the variable cost/unit.
























             3: Find the fixed cost, using either level.


                     Fixed cost = Total cost at activity level – total variable cost.







       87
   82   83   84   85   86   87   88   89   90   91   92