Page 31 - Microsoft Word - 00 CIMA F1 Prelims STUDENT 2018.docx
P. 31
Activity based costing
2.3 Calculating the full production cost per unit using ABC
There are five steps to calculating an activity based cost.
Identify activities.
Estimate cost pools.
Identify cost drivers.
Calculate cost driver rate = The total in the cost pool divided by the
total of the cost drivers.
Charge overheads to products via cost driver rates.
27