Page 18 - 2018 Finac1 Test 3 Class Slides - 1. Property, Plant And Equipment
P. 18
TEST 3 PREPARATION
Measurement at recognition – Elements of cost IAS 16.15-22
Elements of cost Read IAS 16.16-18
Self-constructed (IAS16.22)
Not costs of PPE Read IAS 16.19-20
•Exclude internal profits &
abnormal amounts of wasted
material etc
•Borrowing cost (IAS23)
Construction – incidental operation
IAS 16.21
18