Page 18 - 2018 Finac1 Test 3 Class Slides - 1. Property, Plant And Equipment
P. 18

TEST 3 PREPARATION






         Measurement at recognition – Elements of cost IAS 16.15-22









                                     Elements of cost Read IAS 16.16-18








                                                                                     Self-constructed (IAS16.22)
               Not costs of PPE Read IAS 16.19-20
                                                                                     •Exclude internal profits &

                                                                                     abnormal amounts of wasted
                                                                                     material etc

                                                                                     •Borrowing cost (IAS23)
                   Construction – incidental operation
                   IAS 16.21












                                                                                                                                    18
   13   14   15   16   17   18   19   20   21   22   23