Page 17 - PM Integrated Workbook 2018-19
P. 17

A revision of Management Accounting (MA) topics




               1.4  Fixed, flexible and flexed budgets




                                                   1     Fixed budgets

                                     A fixed budget is prepared before the beginning of
                                      a budget period for a single level of activity.


                                                          Fixed, flexible and
                                                          flexed budgets



                          2     Flexible budgets                            3     Flexed budget
                      A flexible budget is also prepared               A flexed budget is prepared at
                       before the beginning of a budget                  the end of the budget period.
                       period.
                                                                        It provides a more meaningful
                      It is also prepared for a number of               estimate of costs and revenues
                       levels of activity.                               and is based on the actual level

                      It requires the analysis of costs                 of output.
                       between fixed and variable                       As a result, the diversity and
                       elements.                                         complexity of products has
                                                                         increased.
                                                                        Not all production overheads
                                                                         are driven by level of activity.




































                                                                                                        9
   12   13   14   15   16   17   18   19   20   21   22